
Real Estate Investing Workshop & Tour in DR Upcoming 2009 Dates: Attend a LIVE Foreclosure Auction at Rogue Investor's Annual "Show Me the Wealth Conference" Kansas City, MO
|
![]() Ocean Star Estates DevelopmentRoad Construction within Ocean Star Estates: Phase I (Blocks A - K)Initial roads were cut in Phase I in August 2008, and currently plans required for permitting have been submitted. The required permitting is currently being obtained to finish the roads to a hard gravel surface, and we have obtained a temporary work permit to enable us to continue to work until the final permit arrives. The roads in Phase I will be finalized as soon as the water and electricity is installed. Currently, we've begun the installation for the water distribution system for Phase I. The electrical infrastructure will be sourced through wind energy. Ocean Star is currently getting quotes for set up and installation for the electricity. We will then begin final preparations for the road infrastructure in Phase I. This will include cutting the roads to grade, and then adding drainage ditches made of rock and concrete. Initially, the roads will have several layers of hard compacted gravel. The roads in Phase I will then be finalized. Final paving will consist of asphalt. (The roads will be paved after the basic infrastructure is completed to avoid tearing them up with heavy equipment.)
*Updated 05/11/2009 |